Unlock the Potential of Geomechanics

Explore our tailored geomechanics services designed specifically for the oil industry to enhance your projects, ensuring efficiency and safety through innovative solutions and expert insights, including: drilling solutions, optimum unconventional reservoir development and advanced Mechanical Earth Models. Our expertise ensures optimal performance and safety in your projects, empowering you to achieve your goals with confidence and clarity.

Mechanical Earth Model (MEM) and Pp Cube

Unlock deeper insight into subsurface behavior with advanced Mechanical Earth Models (MEMs) and Pore Pressure Cubes — essential tools for safe, efficient, and cost-effective oilfield development.


We build MEMs from 1D to 4D, depending on project complexity and data availability. Most MEMs, even today, are 1D, determined along well trajectories. Building 3D model links the seismic interpretation to a comprehensive stratigraphic model including structurally complex surfaces such as faults, salt domes and lenses.


We also deliver high-resolution Pore Pressure Cubes, derived from seismic inversion and calibrated with well data. These 3D volumes provide a continuous view of overpressure distribution, enabling proactive risk management in drilling and development planning.

Drilling Geomechanics

Drilling geomechanics focuses on understanding and managing the mechanical behavior of subsurface formations during the drilling process. By integrating data from well logs, seismic, drilling parameters, and mechanical earth models (MEMs), we provide insights that reduce risk and optimize well construction.

Our drilling geomechanics services help operators avoid costly issues such as wellbore collapse, kicks, and lost circulation by providing reliable predictions of:

  • Mud weight windows
  • Wellbore stability and breakout risk
  • Casing setting depths
  • Fault and fracture interaction during drilling

We also support real-time monitoring to identify early signs of instability, validate MEM assumptions, and adapt mud weight or drilling parameters in real time.

Whether you're planning a challenging exploratory well, deepwater operation, pre-salt reservoir, tectonic area or optimizing drilling performance in a mature field, drilling geomechanics provides the insight and confidence to drill smarter and safer.

Unconventional Reservoirs

Unconventional Geomechanics addresses the unique challenges of developing non-traditional hydrocarbon reservoirs—such as shale gas, tight oil, coalbed methane, and naturally fractured formations. These plays require advanced geomechanical understanding to design effective stimulation, optimize well placement, and ensure long-term well integrity.

Our geomechanics services for unconventional reservoirs are built around high-resolution Mechanical Earth Models (MEMs), tailored to horizontal well environments and stimulation strategies. We integrate log, core, image log, microseismic, and production data.

Key applications include:

  • Wellbore stability in lateral sections
  • Pore pressure and rock strength variability
  • Fracture barriers and landing zone mechanics
  • Casing deformation analysis

Whether you're in the early appraisal phase or managing a mature unconventional asset, our solutions help maximize recovery while reducing operational risk.


Expert Geomechanics Services

Marcelo Frydman is recognized internationally as Geomechanics Advisor. Dr. Frydman has over 35 years in the petroleum industry, 10 years in unconventional. He has worked on a variety of geomechanics studies concerning wellbore stability, pore-pressure models, unconventional reservoirs, sand management, fractured reservoir characterization, hydraulic fracturing modeling, reservoir geomechanics and time-lapse seismic imaging. Dr. Frydman has published more than 100 papers and hold several patents. He has received different awards, including the SPE-Brazil Petroleum Engineer 2008, SLB Leading the Way Award 2009 and 2006 SLB-DCS President Award. Dr. Frydman worked for Phoenix Global Resources, between 2021 and 2024, as the Geomechanics Advisor in Argentina. Before joining Phoenix, Marcelo worked for 20 years at Schlumberger, held several positions, and was responsible for the development of the geomechanics group in Latin America. Before joining Schlumberger, Marcelo worked for 10 years at the Group of Petroleum Engineering and Technology at Pontifical Catholic University of Rio de Janeiro (PUC-Rio) on Brazilian and international research projects.

Talk to us

Have any questions? We are always open to talk about your business, new projects, creative opportunities and how we can help you.